Land & Infrastructure development


Land Cleaning

Site selection with suitable grid connectivity
Acquisition of land for 1 MW (6 to 7 acres)
Clearing & Leveling of site
Fencing / Compound wall of site
Bay Extension at the SS
Laying of Transmission line along with right of way
Laying of Approach Road and Internal road
Digging bore wells
RO Plant with underground RAW / RO RCC Tank with Steel Building
Installing High Pressure Water pipe lining system for cleaning panels


Approvals & Permits


Obtaining local body Approval
Obtaining NOC from DTPC
Obtaining Plan approval from Local body
Obtaining Pollution Control – CTE & CTO
Facilitating Drawing & safety approval from CEIG
Facilitating with TEDA to forward the file to MNRE for duty Exemption Certificate
TANGEDCO Approvals
Application